Welcome to english.eastday.com.Today is
Follow us @
Contribute to us!

Shanghai

Business

Culture

China

World

Pictures

Topics

Life

Services

MNCs in Shanghai Best Practice Awards|Cool City
Lujiazui Forum|BRICS Economic Think Tank Forum
11th SH Int'l Youth Interactive Friendship Camp |New Year of China’s 56th Ethnic Minority—Jino’s Forging Iron Festival
China Stories
Consul Generals' New Year Wishes 2015
Where to go today?
Home >> Shanghai >> Article
Hailun Road reconstruction to go through Siping Road
By:Jiang Wenran  |  From:english.eastday.com  |  2017-08-08 15:31

Shanghai, August 4- Hailun Road will have to be closed for construction starting on the night of August 4. At that time, vehicles and pedestrians will have to make a detour.

The closed segments include Hailun Road (Wuzhou Road – Haila’er Road), the old bridge of Shajing Harbor as well as Shajinggang Road (Tianshui Road- Hailun Road).

Besides, Hujiamuqiao Road (Tongzhou Road- Hailun Road) will change from the original south-to-north one-way street to north-to-south.

The whole project will be finished by the end of 2017. At that time, Hailun Road will change from a 10-meter-wide road to a very wide road.

Notably, vehicles will no longer need to make a detour through Tongzhou Road and can get through to Siping Road directly.

Share